This proposed project is a 43 lot subdivision with associated roadway, utilities and 2 stormwater control measures (SCM). Construction Drawing Initial SubmittalAugust 12, 2025Construction DrawingSurveyTraffic Impact Analysis (TIA)Utility Allocation Policy